About Us        TurboNews        Magazine        Catalogue        Subscription        Advertise with us        Contacts
ICQ Contact
 
Marina Stukota
Overseas Manager
555-615-381

 

 
 
 
NEW! All the subscribers to the printed edition can have access to the digital one free of charge.
You don’t have to wait till the printed magazine gets delivered to you. Get the information as soon as it gets published.
Now all the subscribers registered at our web-site can read the newly published issues on-line in pdf format.
As soon as you log in go to USER MENU, then click on TO SUBSCRIBERS and enjoy the issue!
If you are a subscriber already, click here to register.
 

The modernisation of gas compression package at Pikalevo compressor station is finished

GPA-Ts-6.3 gas compression package was put into operation in November 2008 at Pikalevo compressor station at Gryazovets-Leningrad gas pipeline (Gazprom transgaz Saint-Petersburg).


Read more...
 

The gas compression packages were delivered to Novo-Arzamasskaya compressor station of Gazprom transgaz Nizhny Novgorod

Zelenodolsk machine building plant, KMPO department, delivered six gas compression packages to Novo-Arzamasskaya compressor station.


Read more...
 

Gazprom transgaz Surgut continues to construct Purtazovskaya-4 compressor station

In the second half of 2008 two start-up complexes of the fourth constructed shop at Purtazovskaya compressor station (Urengoy-Chelyabinsk-Purtazovskoye gas condensate field): four Ural GPA-16M-04 gas compression packages supplied by Iskra-Turbogaz. Each package is equipped with GTU-16P gas turbine drive (PMZ) and 398-26-1LSM gas compressor (Compressor Complex).


Read more...
 

Mobile GTES commissioned additional facilities at the sites of Moscow region

Two MR-25 MOBILEPAC powerplants produced by Pratt & Whitney Power Systems were transferred from the sites in Moscow region (from Pushkino and Daryino substations) to Gaiduk village under Novorossisk in April-May 2008 to increase the reliability of power supply in Novorossisk, Gelendzhik, Anapa, Anabinsky and Krymsky districts. To compensate the lack of equipment two more gas turbine powerplants at Daryino #316 site and Pushkino #239 site were commissioned and started in February 2009.


Read more...
 

Gazprom transgaz Ukhta put into operation Neva-25NK-R gas compression package at Gryazovetskaya compressor station in December 2008

GTN-25/76NK package with the terminated service life was replaced with the modular Neva-25NK-R gas compression package produced by Motorostroitel.


Read more...
 

Sumy Frunze NPO began to produce the compressor equipment for Gryazovetskaya compressor station of North-European gas pipeline

Gryazovetskaya compressor station comprises of four modular GPA-Ts-25 gas compression packages each rated at 25 MW.


Read more...
 

Two gas compression packages produced by Solar Turbines were put into operation at the reconstructed Rostashinskaya compressor station (TNK-BP) at the end of 2008

The power of Saturn 20 gas turbine drive is 1.185 MW, the efficiency is 24.5%. S160 gas compressor and the automatic control system were supplied by Solar Turbines.


Read more...
 

The first stage of Rogozhnikovskaya GTES powerplant was commissioned

The first stage of the powerplant at Rogozhnikovskoye field was put into operation at the end of 2008 at Surgutneftegaz.


Read more...
 

Ukrtransgaz commissioned Bobrovnitskaya compressor station (Chernigovsk region) at the end of 2008

Six new GPA-6.3S gas compression packages with the efficiency of 31% produced by Sumy Frunze NPO are installed at the station.


Read more...
 

KS-1 compressor station at Priobskoye field of Rosneft-Yuganskneftegaz was put into operation

In December 2008 Iskra-Energetika finished the designing, construction and commissioning of the casing head gas recovery complex of Priobskoye and Prirazlomnoye fields. The complex is located 65 km to the east of Khanty-Mansiysk.


Read more...
 

Two compressor rooms in Tayezhnoye department of Gazprom transgaz Yugorsk were put into operation

KTs-9 and KTs-10 compressor rooms of Tayezhnaya compressor station of Yamburg-Volga region gas pipeline were started in December 2008.


Read more...
 

The fourth Ufa GPA-16R gas compression package was put into operation at Polyanskaya KS-4 compressor station

Under the reconstruction of Polyanskaya KS-4 compressor station (Gazprom transgaz Ufa) Ufa-AviaGaz supplied and put into operation the fourth gas compression package produced by UMPO in December 2008.


Read more...
 

Gazprom transgaz Ufa continues the reconstruction of Moskovo KS-5 compressor station

Ufa GPA-16R gas compression package produced by UMPO was put into operation by Ufa-AviaGaz in December 2008 according to the plan of Moskovo KS-5 compressor station reconstruction and to the order of Gazprom transgaz Ufa.


Read more...
 

The equipment is assembled at the constructed booster compressor station at Khancheyskoye field

Two Ural GPA-10 gas compression packages produced by Iskra will be put into operation at Khancheyskoye oil-gas condensate field (Purovsky district, the Yamalo-Nenets Autonomous district).


Read more...
 

Mobile GTES put into operation two mobile gas turbine powerplants in Vladivostok

The ceremony on the commissioning of two MOBILEPAC-25 mobile gas turbine powerplants produced by Pratt & Whitney with the total capacity of 45 MW was held in December 2008 at Vladivostokskaya TETs-1 heat and power plant (Far East Generating Company).


Read more...
 

The reconstruction of gas compression packages #32 and 33 at Purovskaya compressor station of Urengoy-Centre 2 gas pipeline (Gazprom transgaz Yugorsk) is finished

The reconstruction of GPA-10-01 gas compression packages at the compressor station of Purovskoye department was aimed at the replacement of DR59R engines and N235-21 centrifugal supercharger with the terminated service life.


Read more...
 

GTES powerplant of Novourengoysky gas and chemical complex is designed

Teploelektroproekt (department of Engineering Centre EES) continues to design GTES-120 powerplant for Novourengoysky gas and chemical complex according to the agreement signed with VIS in autumn 2008.


Read more...
 
More...
<< Start < Prev 1 2 3 4 5 6 Next > End >>

Results 1 - 40 of 228

Gas Turbo
Equipment Catalogue.
Edition 3

Gas Turbo
Equipment Catalogue.
Edition 2

Gas Turbo
Equipment Catalogue
Edition 1

The second international issue
of Gas Turbo Technology magazine 2010

The first international issue
of Gas Turbo Technology magazine 2010

The fourth international issue
of Gas Turbo Technology magazine

The third international issue
of Gas Turbo Technology magazine 2009

 
About Us        TurboNews        Magazine        Catalogue        Subscription        Advertise with us        Contacts