|
E4 Group will be the prime contractor for Krasnodarskaya powerplant expansion
In February 2008 UGK TGK-8 (territorial generating company) named E4 Group as the prime contractor for the project on Krasnodarskaya powerplant expansion and PGU-410 combined cycle package construction.
|
|
Read more...
|
|
|
Power Machines will supply the prime equipment for Pervomayskaya TETs-14 heat and power plant
Power Machines and EMK-Engineering signed the contract to supply the power generation equipment for two combined cycle plants rated at 180 MW each at Pervomayskaya TETs-14 powerplant (TGK-1 territorial generating company).
|
|
Read more...
|
|
|
PGU-240 combined cycle plant is built at Novomoskovskaya powerplant
TGK-4 (territorial generating company) started the construction of combined cycle package rated at 240 MW at Novomoskovskay state district powerplant (Tula region) on February 27, 2008.
|
|
Read more...
|
|
|
Power Machines will supply equipment for Sisak-3 heat and powerplant (Croatia)
Power Machines and Technopromexport, the construction prime contractor, signed the contract valued about $ 72 million to supply the main power equipment for the constructed CHP.
|
|
Read more...
|
|
|
Gas turbines were delivered to GTES-72 gas turbine powerplant at Vatyeganskoye field
Perm Engine Company delivered six GTU-12PG-2 gas turbines for Lukoil-Zapadnaya Sibir.
|
|
Read more...
|
|
|
Intertechelectro-New Generation and General Electric signed the contract for gas turbine supply to combined cycle powerplant at Vologodskaya CHP
Previously Intertechelectro-New Generation and TGK-2 (Territorial Generating Company) signed the general contractor contract according to which Intertechelectro-New Generation as an EPC/EPCM contractor will build a combined cycle plant at Vologodskaya CHP on turnkey basis.
|
|
Read more...
|
|
|
Power Machines successfully tested GTE-65 gas turbine for TETs-9 combined heat and power plant (Mosenergo)
It is the first gas turbine of the average capacity (in the range from 50 to 100 MW) produced by Russian industry.
|
|
Read more...
|
|
|
Power Machines will supply the main equipment for PGU-450 combined cycle powerplant at Pravoberezhnaya TETs-5 heat and power plant
On January 9, 2008 Power Machines and Trest Sevzapenergomontazh (the powerplant construction prime contractor) signed the agreement to supply power equipment for PGU-450 combined cycle plant construction.
|
|
Read more...
|
|
|
Gas treatment equipment was commissioned at Kharvutinskoye gas condensate field (Yamburggazdobycha)
It includes a cogeneration powerplant rated at 10 MW, consisting of four GTES-2,5 gas turbine powerplants.
|
|
Read more...
|
|
|
Saturn will deliver six GTD-110 gas turbines for Nizhegorodskaya powerplant construction
Saturn – Gas Turbines signed a contract with TGK-6 (Territorial Generating Company) to produce and deliver six GTD-110 gas turbines for the construction of three combined cycle plants.
|
|
Read more...
|
|
|
Gas turbine for high speed landing boat
The technical project of the main gas turbine for Dugon high speed boat designed by Alexeev design bureau was presented at Saturn scientific and technical council session.
|
|
Read more...
|
|
|
Aviadvigatel continues cooperation with Gazprom in 2008
Aviadvigatel, a part of Perm Engine Company, signed a contract with Iskra-Avigaz in the end of 2007.
|
|
Read more...
|
|
|
Five GPA-16M Ural gas compression packages were commissioned at Kamensk-Shakhtinskaya compressor station (Rostov region)
The commissioning took place in November 2007.
|
|
Read more...
|
|
|
Generators for turbine expander packages at Surgutskaya GRES-2 powerplant
Privod delivered two T-6-2ZU3.1 generators in January 2008.
|
|
Read more...
|
|
|
TGK-9 and Siemens signed the contract for the equipment supply to Permskaya TETs-6 heat and power plant reconstruction
A new 120 MW powerplant will be built at Permskaya TETs-6.
|
|
Read more...
|
|
|
The general contractor contract for Livenskaya CHP reconstruction was signed
TGK-4 (Territorial Generating Company) signed the contract with TsNTI (Center of Scientific and Technical Innovations for Energy Sector).
|
|
Read more...
|
|
|
The main equipment for PGU-240 combined cycle plant was delivered to Minskaya TETs-3 heat and power plant
The contract was signed by Alstom with Minskenergo in April 2006.
|
|
Read more...
|
|
|
Successful testing of new gas control equipment
The set of gas control equipment for GTK-10I gas compression package was tested and commissioned in Severgazprom.
|
|
Read more...
|
|
|
Bashkirenergo is commissioning a new GTE-10/95BM cogeneration powerplant
The trial commissioning started in December 2005.
|
|
Read more...
|
|
|
Intertechelectro-New Generation design company became the winner in the open tender
The tender was held by TGK-2 (territorial generating company), five companies participated in it.
|
|
Read more...
|
|