About Us        TurboNews        Magazine        Catalogue        Subscription        Advertise with us        Contacts
ICQ Contact
 
Marina Stukota
Overseas Manager
555-615-381

 

 
Three GPA-Ts-10B gas compression packages are delivered to Babaevskaya compressor sta-tion Print E-mail

Three GPA-Ts-10B gas compression packages are delivered to Babaevskaya compressor sta-tion


Sumy Frunze NPO gas compression packages are equipped with NK-14ST-10 gas turbines (Motorostroitel). Four similar gas compression packages are operated at the compressor station.


The new packages have the upgraded exhaust and heat recovery system, designed and manu-factured by Samara-Aviagaz.
The heat recovery boilers were designed and manufactured by Anod-TC (Nizhny Novgorod). The heat recovery system does not require gas-bypassing.
The equipment delivery was completed in August 2007. At present the assembling is carried out.
The commissioning is planned for 2008.


 

Gas Turbo
Equipment Catalogue.
Edition 3

Gas Turbo
Equipment Catalogue.
Edition 2

Gas Turbo
Equipment Catalogue
Edition 1

The second international issue
of Gas Turbo Technology magazine 2010

The first international issue
of Gas Turbo Technology magazine 2010

The fourth international issue
of Gas Turbo Technology magazine

The third international issue
of Gas Turbo Technology magazine 2009

 
About Us        TurboNews        Magazine        Catalogue        Subscription        Advertise with us        Contacts