About Us        TurboNews        Magazine        Catalogue        Subscription        Advertise with us        Contacts
ICQ Contact
 
Marina Stukota
Overseas Manager
555-615-381

 

 
Kaluga Sales Company and Dominanta Energy made an agreement on powerplant construction in Obninsk Print E-mail

Kaluga Sales Company and Dominanta Energy made an agreement on powerplant construction in Obninsk

The value of general contractor contract will be 879 million rubles. LM2500 gas turbine plant rated at 20.8 MW produced by General Electric will be used. The powerplant heat capacity will be 28 Gcal/h. The plant will include BDAX 7-167 ESS generator produced by Brush Electrical Machines Ltd, waste heat recovery boiler produced by UEMZ (Ukhta), LOOS UTM64 backup hot water boiler with the installed capacity of 18 MW, and exhaust stack. The equipment will be installed in the building with noise suppression system.


{To read the complete text of the news you should log in/register}
 

Gas Turbo
Equipment Catalogue.
Edition 3

Gas Turbo
Equipment Catalogue.
Edition 2

Gas Turbo
Equipment Catalogue
Edition 1

The second international issue
of Gas Turbo Technology magazine 2010

The first international issue
of Gas Turbo Technology magazine 2010

The fourth international issue
of Gas Turbo Technology magazine

The third international issue
of Gas Turbo Technology magazine 2009

 
About Us        TurboNews        Magazine        Catalogue        Subscription        Advertise with us        Contacts