About Us        TurboNews        Magazine        Catalogue        Subscription        Advertise with us        Contacts
ICQ Contact
 
Marina Stukota
Overseas Manager
555-615-381




 

 
Electrosistemy continue to put microturbines into operation Print E-mail

Electrosistemy continue to put microturbines into operation

The commissioning was finished and the operation of small combined cycle plants based on two TA-100 RCHP microturbines installed outdoors produced by Calnetix Power Solutions was started in July.


{To read the complete text of the news you should log in/register}
 
< Prev   Next >

Gas Turbo
Equipment Catalogue.
Edition 3

Gas Turbo
Equipment Catalogue.
Edition 2

Gas Turbo
Equipment Catalogue
Edition 1

The fourth international issue
of Gas Turbo Technology magazine

The third international issue
of Gas Turbo Technology magazine 2009

The second international issue
of Gas Turbo Technology magazine 2009

The first international issue
of Gas Turbo Technology magazine 2009

 
About Us        TurboNews        Magazine        Catalogue        Subscription        Advertise with us        Contacts