|
The power system of gas pipeline bend was put into operation for the heat and power plant |
|
|
|
The power system of gas pipeline bend was put into operation for the heat and power plant in Nikolaevsk-na-Amure
The Far Eastern Generating Company put into operation the power system consisting of 22 Capstone C30 microturbines with the total power of 660 kW in January 2009.
{To read the complete text of the news you should log in/register}
|