About Us        TurboNews        Magazine        Catalogue        Subscription        Advertise with us        Contacts
ICQ Contact
 
Marina Stukota
Overseas Manager
555-615-381

 
The reconstruction of gas compression packages #32 and 33 at Purovskaya compressor station Print E-mail

The reconstruction of gas compression packages #32 and 33 at Purovskaya compressor station of Urengoy-Centre 2 gas pipeline (Gazprom transgaz Yugorsk) is finished

The reconstruction of GPA-10-01 gas compression packages at the compressor station of Purovskoye department was aimed at the replacement of DR59R engines and N235-21 centrifugal supercharger with the terminated service life.


{To read the complete text of the news you should log in/register}
 

Gas Turbo
Equipment Catalogue.
Edition 3

Gas Turbo
Equipment Catalogue.
Edition 2

Gas Turbo
Equipment Catalogue
Edition 1

The second international issue
of Gas Turbo Technology magazine 2010

The first international issue
of Gas Turbo Technology magazine 2010

The fourth international issue
of Gas Turbo Technology magazine

The third international issue
of Gas Turbo Technology magazine 2009

 
About Us        TurboNews        Magazine        Catalogue        Subscription        Advertise with us        Contacts