About Us        TurboNews        Magazine        Catalogue        Subscription        Advertise with us        Contacts
ICQ Contact
 
Marina Stukota
Overseas Manager
555-615-381




 

 
The fourth Ufa GPA-16R gas compression package was put into operation Print E-mail

The fourth Ufa GPA-16R gas compression package was put into operation at Polyanskaya KS-4 compressor station

Under the reconstruction of Polyanskaya KS-4 compressor station (Gazprom transgaz Ufa) Ufa-AviaGaz supplied and put into operation the fourth gas compression package produced by UMPO in December 2008.


{To read the complete text of the news you should log in/register}
 
< Prev   Next >

Gas Turbo
Equipment Catalogue.
Edition 3

Gas Turbo
Equipment Catalogue.
Edition 2

Gas Turbo
Equipment Catalogue
Edition 1

The fourth international issue
of Gas Turbo Technology magazine

The third international issue
of Gas Turbo Technology magazine 2009

The second international issue
of Gas Turbo Technology magazine 2009

The first international issue
of Gas Turbo Technology magazine 2009

 
About Us        TurboNews        Magazine        Catalogue        Subscription        Advertise with us        Contacts