|
The fourth Ufa GPA-16R gas compression package was put into operation |
|
|
|
The fourth Ufa GPA-16R gas compression package was put into operation at Polyanskaya KS-4 compressor station
Under the reconstruction of Polyanskaya KS-4 compressor station (Gazprom transgaz Ufa) Ufa-AviaGaz supplied and put into operation the fourth gas compression package produced by UMPO in December 2008.
{To read the complete text of the news you should log in/register}
|