About Us        TurboNews        Magazine        Catalogue        Subscription        Advertise with us        Contacts
ICQ Contact
 
Marina Stukota
Overseas Manager
555-615-381

 
KS-1 compressor station at Priobskoye field of Rosneft-Yuganskneftegaz was put into operation Print E-mail

KS-1 compressor station at Priobskoye field of Rosneft-Yuganskneftegaz was put into operation

In December 2008 Iskra-Energetika finished the designing, construction and commissioning of the casing head gas recovery complex of Priobskoye and Prirazlomnoye fields. The complex is located 65 km to the east of Khanty-Mansiysk.


{To read the complete text of the news you should log in/register}
 

Gas Turbo
Equipment Catalogue.
Edition 3

Gas Turbo
Equipment Catalogue.
Edition 2

Gas Turbo
Equipment Catalogue
Edition 1

The second international issue
of Gas Turbo Technology magazine 2010

The first international issue
of Gas Turbo Technology magazine 2010

The fourth international issue
of Gas Turbo Technology magazine

The third international issue
of Gas Turbo Technology magazine 2009

 
About Us        TurboNews        Magazine        Catalogue        Subscription        Advertise with us        Contacts