Taking into account the present-day power industry condition, it can be said the small-scale power generation customers don’t have sufficient information about gas turbine technologies and GT powerplants. A great number of potential customers are unaware of them. Unlike many international countries where gas turbines are widely used, they are still rare in Russia.
To define the power project cost-effectiveness, a feasibility study must be carried out based on the particular project data, provided by the customer. First of all, the customer is interested in the amount of capital investments, pay-back period, discounted revenue, and power production cost.
The decision on GT powerplant construction and funding requires design estimates (feasibility study and engineering documentation). It’s a long-term and costly work. For example, a 12 MW powerplant project costs approximately 30 million roubles (about 900.000 Euros), including the cost assessment (25% or 7.5 million roubles / 220.000 Euros). The cost assessment lead time can be 4-6 months.
The preliminary cost estimation, determination of a payback period and energy net cost can be done in the expert “mini feasibility study”. The customer will have a comprehensive idea about the powerplant’s arrangement as well as its specifications, performance and economics at a relatively low price.
In this respect, Gas Turbo Technology magazine has organized an Expert Consulting Group. It includes experts and consultants on powerplants as well as design and construction of combined heat and powerplants. The objectives of this Group are:
- promotion of gas turbines on the Russian power market
- gas turbine market analysis
- consulting on gas turbine application and usage of the corresponding equipment in power production
- conducting feasibility study, determination of a project’s payback period
- preparing a Technical Design Assignment
- power project investment substantiation (“mini feasibility study”)
The procedure is quite simple. Fill in the question list and send it to the address given below. We will be glad to consult you on the power project feasibility as well as the primary equipment selection. The more comprehensive data and further services will be fee-based.
The cost of services:
- Assignment 1: doing a feasibility study and determination of a power project payback period starting with 70.000 roubles / 2.100 Euros (+18% Russian VAT). The performance period is 20 days from the moment of advance payment, business trip not included.
- Assignment 2: preparing a Technical Design Assignment starting with 30.000 roubles / 900 Euros (+18% Russian VAT) + business trip expenses. The performance period is 15 days from the moment of advance payment, business trip not included.
- Assignment 3: power project investment substantiation (“mini feasibility study”) starting with 150.000 roubles / 4.500 Euro (+18% Russian VAT) + business trip expenses. The performance period is 45 days from the moment of advance payment, business trip not included.
If you’ve made a decision to use our services, please fill in the question list, sign it and send to the address given below. After the data pre-processing we’ll inform you about the project feasibility as well as the primary equipment selection.
Our address:
148, Lenin Ave., office 115, Rybinsk, Yaroslavl region, 152 903, Russia
Fax +7 (4855) 210 777
E-mail:
This email address is being protected from spam bots, you need Javascript enabled to view it
To: Alexander Gorshkov
Director of Gas Turbo Technology magazine |