| Gas turbine power plant in Labytnangy is at the precommissioning stage |
|
Gas turbine power plant in Labytnangy is at the precommissioning stage The cogeneration powerplant is based on the Zorya-Mashproekt D014 engine with the nominal power rating of 12 MW... The similar engine was operated within the railway mobile powerplant which had been installed at the same plant in 1990. The exhaust heat will be used for heating system water. The water waste heat boiler is manufactured by UEMZ. The primary fuel will be natural gas. |