| Ansaldo Energia S.p.A. to deliver gas turbines to Yugo-Zapadnaya TETs heat and power plant |
|
Ansaldo Energia S.p.A. to deliver gas turbines to Yugo-Zapadnaya TETs heat and power plant On October 25, 2007 Ansaldo Energia S.p.A. and the general contractor Stroytransgaz signed a contract for the delivery of two V64.3A gas turbines for the first stage of the powerplant.
The electric capacity of gas turbines is 66 MW each. The fuel flow rate is 80% at the heat mode.
|